NEWS, COMMUNITY, RECREATION, FRIENDS & FAMILY | MUSWELLBROOK, SINGLETON & SURROUNDS

May 21, 2025 6:42 AM

Changed overnight traffic conditions on Mitchell Line of Road, Singleton

SHARE THE STORY:

Motorists are advised of changed overnight traffic conditions from Monday 28 April for essential bridge inspection work on Mitchell Line of Road, Singleton.

Transport for NSW will carry out culvert repairs and vegetation clearing as part of ongoing maintenance to ensure the structure remains safe and fit for purpose.

Work will start on Monday 28 April and is expected to be completed by Thursday 1 May, weather permitting.
Work will be carried out from 7pm to 5am.

There will be one lane closed with alternate stop/slow traffic control and a reduced 40km/h speed limit in place during work hours and motorists may experience minor delays.

Wide loads greater than 3.5 metres will be temporarily stopped by traffic control to allow cones or work vehicles to be moved for safe passage. Advance warning signage and UHF contact details will be in place to assist OSOM operators.

Motorists are advised to drive to the conditions and follow the directions of signs and traffic control.
Transport for NSW thanks motorists for their patience during this time.

For more information on this work visit www.livetraffic.com/incident-details/232322, download the Live Traffic NSW App or call 132 701.

To receive updates direct to your phone, search for ‘Mitchell Line of Road’ in your Live Traffic app, select the incident and click ‘Follow’.

(Via Transport for NSW)

SHARE THE STORY: