Changed traffic conditions on Kayuga Road at Muswellbrook to carry out work on Kayuga Bridge

Motorists are advised changed traffic conditions will continue next week on Kayuga Road at Muswellbrook to carry out maintenance work on Kayuga Bridge. 

Transport for NSW is carrying out bridge maintenance and vegetation clearing from Monday 22 November.

Work is being carried out from 7am to 5pm weekdays and is expected to be completed in two weeks, weather permitting.

Traffic control and a reduced speed limit of 40km/h will be in place for the safety of workers and motorists.

Motorists are advised to drive to the conditions, allow up to 10 minutes extra travel time, and follow the directions of signs and traffic control.

Transport for NSW thanks motorists for their patience during this time.

For the latest traffic updates download the Live Traffic NSW App, visit livetraffic.com or call 132 701.