Motorists are advised of changed traffic conditions next week on the Golden Highway near Wambo Street on the westbound and Pearse Street on the eastbound approaches to Jerrys Plains.
Work to install town entry gateway treatments is scheduled from Monday 16 March to Saturday 21 March from 7am to 6pm, weather permitting. A reduced speed limit of 40 km/h will be in place for the duration of the work Motorists are advised to drive to the conditions and follow the directions of signs and traffic control.
Motorists should plan their trip, allow up to five minutes of extra travel time and follow the directions of traffic control and signs.
Transport for NSW thanks motorists for their patience during this time.
For more information about this work, visit https://www.livetraffic.com/incident-details/267115 or download the Live Traffic NSW app.